COURSE

   

Prosafe-RS Engineering R3 (PSRS_E)
Training Period
4 Days
(09.00 - 16.30 pm)
Training Fee
55,500
(exclude VAT 7%) Baht/Person
Maximum
12
Participants
     
26-29 Dec 201918-21 Feb 202028-31 Apr 2020

Objectivity

Enable ProSafe-RS system users to operate, maintain and modify the system with respect to  the user interface Workbench.The course will outline the systems safety features and provide the opportunity through.

Venue

Yokogawa (Thailand) Ltd. Bangkok Offce (Rama 9) and Rayong Branch Offce (Maptaput)

Instructor

IAEC trainers, Engineer, Yokogawa (Thailand) Ltd.

Participant

Process engineers, process control engineers, maintenance and technical support personnel.

Requirement

Participants should have attended CENTUM CS 3000 Operation and Engineering course Fundamental knowledge of computers and a working knowledge of MS-Windows, electronics and Boolean logic.

Course Outline detail

Day Morning ( 09.00 to 12.00 ) Afternoon ( 13.00 to 16.30 )

1st
  • ProSafe-RS Documentation
    • ProSafe-RS Documentation
    • ProSafe-RS Hardware
    • CPU, I/O Modules, Power Supply, Setting Domain and Station number.E33
  • Introduction to Prosafe-RS  Workbench
  • I/O Parameter Builder Setting
  • Laboratory work :
    • ProSafe-RS Hardware Familiarisation-Setup
    • Safety Node I/O Modules according to the instruction
    • Working with the Workbench

2nd
  • Introduction to the ProSafe-RS Languages (IEC-61131-3)
  • Function Block Logic
  • Different between Function and Function Block
  • Creating User Define Function Block
  • Ladder Logic
  • Laboratory work :
    • Creating a project with Function Block Logic
    • Presentation of each team
    • Ladder Logic Configuration
    • Presentation of each team

3rd
  • Integration with/communication to other systems
  • OVER_x block, ANGI block, ANN block etc
  • Sequence of Event Viewer
  • Small Project Exercise.
  • Built a small project with C&E provided.
  • Laboratory work :
    • Communication to other ProSafe-RS Stations
    • CS3000 Integration
    • Setting up the Sequence of Event Viewer

4th
  • Integration test between SCSs and HISs.
  • Shutdown signals configurations.
  • Laboratory work :
    • Discussion and close-up of small project exercise.